Loading...
SERVICES 2017-12-15T14:50:09+00:00

Petrochemical Project Construction

UG Piping Installation

Power Panel Installation

Nanjing Huarun Company is one of a few companies to construct integrated petrochemical facilities that begin with basic feedstock and produce finished polymer and other end-products. We have proven history in designing and building plants that produce high-quality, high-demand products such as ethylene, polyethylene, polypropylene, butylenes, polyester and PET, and polyvinyl chloride.

In addition to processes using traditional feedstock, we have expertise in non-traditional processes for chemical production from such sources as natural gas and coal. We provide a full range of services, from front-end design and optimization to construction and commissioning.

Nanjing Huarun Company has extensive experience with process design packages as well as technology from multiple licensors for polyethylene, polypropylene, the vinyl chain, and other products.

E & I Installation

The electrical control engineering specialty of Nanjing Huarun Middle East Construction Company has mature technology and rich experiences in construction management, mainly undertaking installation and testing of medium and low voltage power transformation and distribution, Substations and its accessories up to 11KV for Oil & Gas, Petrochemicals & Power sectors, Power cable pulling, connection, testing, and transformers, switch gears, MCC or other Cabinet installation. Grounding and Lighting Systems. Fire Alarm, Fire Detection and Fire Protection system. Telecommunication and Public address system
The mainly work for instrumentation automatic control included detailed engineering, procurement, installation, testing and commissioning. Control cable pulling, connection, testing, and field junction box, control panel, instrument, cabinet in RIB mounted installation and so on. Distributed Control System, Emergency Shutdown System, Programmable Logic Controllers, Fiber Optic Links, Fire and Gas systems, Metering Systems, Analyzer Systems.

Power Cable Laying

Prefabrication

Non-Standard Parts Prefabrication

Prefabrication is the practice of assembling components of a structure in a factory or other manufacturing site, and transporting complete assemblies or sub-assemblies in the contstruction site where the structure is to be located…

Non-Standard fabrication factory is a field of 50,000m2 in Al Jubail, it has three workshop 7000m2 in total Undertake Piping prefabrication, Non-standard parts prefabrication (piping support and civil embedded parts)

Aims of Prefabrication Construction

  • Prefabrication is used to effect economy in cost
  • Components manufactured under controlled conditions
  • The speed of construction is increased since no curing period is necessary
  • Prefabrication helps in the use of locally availablematerials with required charactristics like light-weight; easy workability; thermal insulation; non-combustibility etc.

Advantage of Prefabricated Parts

  • The main advanctges of prefabricated structures are assembly of finished elements on site, sell load bearing and quick execution.
  • Higher quality products for clients.
    Improved productivity and profitability for contractors.
  • Environmental benefits associated with its use.
  • Quicker build times on site.
  • Better ability to build to optimum cost.
  • Higher quality end products due to closer factory control of part of the process.

Characteristics Are To Be Considered

  • Easy availability;
  • Light weight for easy handling and transport, and to economies on sections and sizes of foundations;
  • Thermal insulation property;
  • Easy workability;
  • Durability in all weather conditions;
  • Non-Combustibility;
  • Economy in cost, and
  • Sound insulation

Classification Of Structural Scheme With Precast Large Panel

Wall Systems

  • Cross Wall System – In this scheme, the cross wall are load bearing walls whereas the facade wall are non-load bearing this system is suitable for high rise buildings.
  • Longitudinal Wall System – In this scheme the cross walls are non-load bearing whereas Longitudinal walls are load bearing walls. This system is suitable for low rise buildings.
  • A combination of the above system with all load bearing walls can also be adopted

Building Prefabricated Portable House

WORKSHOP

Camp Room Building

Site Office

NANJING HUARUN COMPANY

Nanjing Huarun Company
Middle East

Strategy and Implementation Summary

Our marketing strategy emphasizes focus. This will be the key. We are a relatively small company and hence must focus on certain kinds of services with certain kinds of users. Initially Palms and Bonds will focus on the local market and in the market research and training fields. The target customers will include key decision-makers in the large, medium and small-sized organizations in a start-up and growth periods.

NHC Business Strategy

Our business development plan is a road map that defines where we want to take our business and the steps we need to complete to get there. It includes measurable milestones that can be monitored and adjusted to meet new challenges as they arise and take advantage of unexpected opportunities.

Ready to Talk?

DO YOU HAVE A BIG IDEA WE CAN HELP WITH?

Contact Us